|
|
Automation: All the machineries of the plant
are switched on and off by the main switch – room. The diagram of the plant can be
changed and adapted to the quality of raw material and the needed
specifications of the end products. All the lines designating the diagram of the plant are controlled
by the main switch – room and can be changed to form a new diagram. |